Our Solutions
Real Impact in Large-Scale Projects
Discover our digital solutions and transformation cases delivered to sector leaders in energy, mining, construction, and technology.
WHY AUTIS
Engineering data is complex. We simplify it.
We combine BI, BIM 4D, and AI Agents in a cohesive stack for large-scale infrastructure projects.
01
See
Real-time executive dashboards connected to Primavera P6, SAP, and Microsoft 365. Managers spot deviations before opening a spreadsheet.
150% average ROI
02
Automate
AI Agents that audit XER schedules, generate PDF reports, and eliminate hours of weekly manual work — without leaving Microsoft Teams.
80% less manual work
03
Execute
BIM 4D connected to the schedule. Every model element linked to an activity. Real progress visible by phase, discipline, and work front.
60% less reporting time
Platform
The new way to manage projects with AI and BIM.
We connect BIM, schedule, and real progress in a web platform accessible from any device.
The Autis 4D platform runs in the browser — no installation, no heavy license. Natively integrates with Navisworks, Primavera P6, MS Project, and Microsoft 365.

PLATFORM ARCHITECTURE
How Autis connects everything.
From XER file and BIM model to executive dashboard and automated report.
REAL-TIME VISIBILITY
From the 3D model to the executive KPI on one screen.
Physical progress by discipline, S-curve, constraints, and 4D progress — all powered by your project's real data.

Transformation Cases
Real results in large-scale projects.
Click each case to see the challenge, solution, and results.
Digital Transformation at a 500MW Thermoelectric Complex
Client: European Multinational in the Energy Sector
The complex operated with completely fragmented data: 15+ international contractors used their own ERPs, schedules — ranging from Primavera P6 to Excel spreadsheets — and proprietary report formats. The Project Controls team manually processed hundreds of spreadsheets every week, resulting in reports delayed 3 to 5 days and a high risk of cross-source inconsistencies. Critical contractual milestones for energy delivery to the interconnected grid were at risk, and management had no reliable visibility into the real state of the project. Regulatory pressure demanded complete traceability of all cost and schedule events.
Three problems we eliminate.
No heavy software. No manual spreadsheet. No delayed report.
These are the three bottlenecks we eliminate in every project we work on.
01
Fragmented data
We unify ERP, BIM, and schedule into a single source of truth.
02
Manual reports
We automate the collection, consolidation, and distribution of executive reports.
03
Delayed decisions
KPIs and alerts arrive before the deviation becomes a cost.
Schedule a 30-minute conversation.
We map where your operation has the highest leverage to gain with BI, BIM, or AI Agents.
Talk to Autis